Buying a new-build home in Cyprus: 12 questions answered
Short answers below. The full guide, with the documents behind each answer, comes with your registration.
1. Is a steel frame home a proper house?
Yes. It's a load-bearing steel structure, not a prefab cabin. The frame is engineered in 3D and made in a factory to the millimetre, and the walls are filled with a solid mineral core. It's a solid-walled house, assembled in a different way.
2. Will the steel rust? What about termites and damp?
The steel is galvanised and sealed inside a closed, dry wall, between cement boards and the mineral core, so it has no contact with the weather. There's nothing organic in the wall for termites, rodents or mould to live on.
3. What about fire?
The wall core is a mineral composite classed A1, non-combustible, under EN 13501-1. With our Signature facade, the outer layers are A1 too. Fire resistance for a particular home is set in its design, and we'll show you the figures for yours.
4. Cyprus has earthquakes. Is a steel frame safe?
A lighter building carries less mass, so the earthquake load on it is lower, and steel bends rather than cracks. Every structure is calculated to Eurocode 3 for its own plot by the project's structural engineer.
5. Will it be hot in summer?
Since 2020, the walls of a new home in Cyprus may let through no more than 0.40 W/m²K. Ours let through 0.26 to 0.28, about a third less, with a continuous layer of insulation outside. The house warms up slowly and costs less to cool.
6. Will I hear everything through the walls?
The walls are 232 to 307 mm thick, with 150 mm of dense mineral core. Mass is what stops sound.
7. Who builds my home?
One team that we put together and answer for: an architectural practice with UK experience, a frame manufacturer with more than 700 projects and a general contractor with over 15 years in Cyprus. You can see their finished work.
8. How long does it really take?
Design and planning permits usually take about 3 months. Construction then takes from 6 months on site.
9. What does "fixed price" mean?
Your contract price is fixed for the specification you choose. Before you sign, we show you exactly what's included and what isn't, such as land, VAT and permits.
10. When is the land mine?
If we build on your plot, you own the land and its title deed before we start. Our Stroumbi homes are built on land that Lightsteel Living owns outright: the title deed was registered in July 2026 and shows no charges. You buy from the owner, your lawyer deposits the sale contract at the Land Office, and the title deed for your home is issued once the building is completed, as with any new build. We recommend your own lawyer checks the terms.
11. Can I buy in Cyprus as a UK citizen?
Yes. As non-EU citizens, UK buyers need a routine permit to buy property in Cyprus. Your lawyer applies for it on your behalf. Buying a new home from a developer may also qualify you for Cyprus permanent residency; we'll connect you with an immigration lawyer.
12. Can I get a mortgage, and can I sell later?
Lending rules differ from bank to bank, so we provide the full technical package (structure, thermal performance, material certificates) to any bank or valuer you choose. When you sell, the home goes with the same documents as any other: planning permit, title deed and energy certificate. We don't make predictions about resale prices.